      Buying containerised mobile charging equipment from China is straightforward on the technical side and less so on the commercial side. Product certification, battery transport documentation, warranty structure and the service route all need settling before the order, because they are difficult to renegotiate afterwards.

      MPMC POWERTECH CORP. manufactures containerised and trailer-mounted mobile charging equipment as its BCH Series, documented at 80 kW to 600 kW DC output with 70 kWh to 1,075 kWh of onboard storage. This article sets out what an import-focused evaluation should cover.

      MPMC BCH-500-1000 mobile BESS charger, 20 ft container format with IP54 system protection.

      Certification Is Model-Specific and Market-Specific

      The most common misunderstanding in this segment is treating certification as a supplier attribute. It is not. It applies to a specific model in a specific market, and a supplier holding a certificate for one model does not automatically hold it for another.

      MPMC’s published certification list is set out below. Which entries apply to a given order should be confirmed against the exact model and destination.

      Level

      Listed certifications

      Company

      ISO 9001:2015, ISO 45001, ISO 14001, CNAS-accredited testing centre at Haimen, ARCADIS, ilac MRA, WMI

      Product

      CE, TUV, SGS, UN38.3 for battery transport, SABER for Saudi Arabia, France BV, Russian Customs Union, Nigeria SONCAP, China TLC, UL

      Two entries deserve particular attention for this equipment.

      UN38.3 is the transport test standard for lithium batteries. Without it, shipping a unit containing a large battery is impractical. Confirm the report exists for the cells in the offered configuration, not for a similar product.

      Market-specific certificates such as SABER, SONCAP and the Russian Customs Union documents are usually what determines whether goods clear customs. These should be confirmed early rather than at shipment.

      Transport and Delivery Planning

      Container format simplifies shipping but does not remove the planning.

      Weight and handling

      MPMC lists the BCH-500-1000 at 19,800 kg in a 20 ft GP format, the BCH-800-600 at 15,000 kg and the BCH-600-400 at 8,300 kg, each loading one unit per 20 ft container. The trailer-mounted BCH-275-200 is listed at 2,800 kg with four units per 20 ft container.

      Crane or heavy forklift access, ground bearing and the delivery route to the final position should be confirmed before the order, not on arrival.

      Battery state during shipment

      Lithium batteries ship at a controlled state of charge. Confirm the arrangement with the supplier and whether any action is required on arrival before commissioning.

      Commissioning responsibility

      Confirm who commissions the unit, whether travel is included, and what remote support is available. MPMC lists an EMS with 4G connectivity across the BCH range and an open API, which is the mechanism for remote diagnosis.

      MPMC BCH-275-200 mobile BESS charger in service. 150 kW DC output, 203.5 kWh onboard battery, 2 × CCS2 250 A connectors.

      Matching the Format to the Deployment

      Container format is not automatically the right answer, and the alternative within the same range is often a better fit.

      Deployment pattern

      Format to review

      Reason

      Fixed position for a long period, lifting equipment available

      Container format, BCH-600-400 and above

      Higher onboard capacity, outdoor-rated, one-time positioning

      Frequent relocation between sites

      Trailer-mounted BCH-275-200

      2,800 kg with a 3.5 t heavy-duty trailer and integrated forklift hole

      Multiple small sites served by one asset

      Trailer-mounted BCH-275-200

      Four units per 20 ft container for import, and towable between positions

      Central hub with more than 1 MWh reserve

      BCH-500-1000

      1,075 kWh onboard with 500 kW AC output available in parallel

      The Product Range in Detail

      Model

      DC charging output

      Battery capacity at 25°C

      AC input rated power

      DC connectors

      Weight

      BCH-80-70

      80 kW

      70 kWh

      70 kW DC input

      CCS2 260 A × 1

      880 kg

      BCH-275-200

      150 kW

      203.5 kWh

      80 kW

      CCS2 250 A × 2

      2,800 kg

      BCH-600-400

      400 kW

      407 kWh

      280 kW

      CCS2 350 A × 2

      8,300 kg

      BCH-800-600

      600 kW

      610.6 kWh

      280 kW

      CCS2 350 A × 2

      15,000 kg

      BCH-500-1000

      500 kW

      1,075 kWh

      560 kW

      CCS2 350 A × 2

      19,800 kg

      MPMC lists CCS2 as the standard connector, with optional CCS1, GB/T and CHAdeMO for specific markets. Confirm the connector requirement at the enquiry stage, because it affects the build rather than being a field-changeable item.

      Warranty and Service Structure

      Warranty terms in this segment are usually expressed in two dimensions, and both need reading.

      MPMC’s published terms for the BCH-275-200 and above list a system warranty of 3 years or 1.6 MWh/kWh total output, whichever comes first, with a battery performance warranty of 5 years or 2.57 MWh/kWh and end-of-life capacity retention of at least 70%. The BCH-80-70 is listed separately at 1 year or 60 MWh total output, with a 3-year or 200 MWh battery performance warranty.

      The throughput dimension matters more than the calendar dimension on a heavily used unit. A high-utilisation deployment may reach the energy limit well before the year limit, which changes the effective cover.

      Confirm separately what is excluded. Labour, travel and airfreight are commonly outside the scope unless agreed in the contract.

      Documented Deployments

      Location

      Configuration

      Application

      Netherlands

      BCH-275-200 and BCH-500-1000

      Grid-connected EV charging for port and logistics operations

      United Kingdom

      BCH-275-200 × 8 units

      Port logistics where the local grid limited EV truck charging

      Norway

      BCH Series, 2 MWh total; 500 kW and 1,000 kWh per unit

      Off-grid construction machinery charging

      An Import Timeline

      Most difficulties on imported charging equipment come from items closed too late. The sequence below is ordered by when each has to be settled.

      Stage

      What has to be closed

      Consequence of delay

      Before the enquiry

      Connector standard and DC voltage window

      These affect the build, not the configuration

      At quotation

      Which certificates apply to the exact model and destination

      Certification cannot be added retrospectively

      At order

      UN38.3 documentation for the cells in the offered configuration

      Shipping a large battery without it is impractical

      At order

      Warranty text, both dimensions, with exclusions

      Difficult to renegotiate afterwards

      Before shipment

      Battery state of charge arrangement, and any action needed on arrival

      Affects commissioning readiness

      Before shipment

      Handling equipment, ground bearing and delivery route

      MPMC lists 19,800 kg for the BCH-500-1000, 15,000 kg for the BCH-800-600

      Before arrival

      Commissioning responsibility and travel arrangements

      Determines whether the unit works on day one

      At handover

      Spare parts list, lead time and shipping route

      Sets the recovery time for the first failure

      MPMC’s published certification list covers CE, TUV, SGS, UN38.3, SABER, France BV, Russian Customs Union, Nigeria SONCAP, China TLC and UL, applying by model and market rather than across the range.

      The Clause Most Often Missing

      Warranty documents in this segment usually state what is covered. Fewer state clearly who travels.

      MPMC’s published warranty for the BCH-275-200 and above is 3 years or 1.6 MWh/kWh total output with a 5-year or 2.57 MWh/kWh battery performance warranty, and the general after-sales position excludes labour, travel and airfreight unless agreed in the contract.

      For an imported unit, that exclusion is often the largest part of a repair cost. Two questions are worth putting in writing before the order: which faults can be diagnosed and cleared remotely through the EMS, and what the commercial arrangement is when they cannot.

      A supplier willing to answer both specifically is offering a support model. One that answers with a service network map is offering a brochure.