Zero-emission jobsites are becoming a priority in many European cities, with contractors switching excavators, loaders, dumpers and site vans to battery power. Electric machinery delivers its full benefit when the energy behind it is clean and available on site. MPMC’s BCH Series mobile BESS chargers are built for this role: they store energy from the grid, solar PV or a low-carbon generator set and deliver fast DC charging to machines and vehicles, while also powering the site’s cabins and tools.
The Energy Chain of a Zero-Emission Site
Clean Energy In
BCH units accept energy from several sources. A temporary grid supply connects through CEE or PowerLock sockets, solar arrays connect through a dedicated solar input on the BCH-275-200 and larger models, and every model accepts a CCS2 DC input for fast recharging. Where no grid is available, MPMC’s 400 kVA methanol distributed power station, controlled by a DEIF AGC150, combines with BCH units to form an integrated off-grid green power system for electric construction machinery.
Fast Charging Out
The onboard blade LFP battery then delivers DC charging through CCS2 guns: 150 kW on the trailer-mounted BCH-275-200, and 400 kW to 600 kW on the BCH-600-400, BCH-800-600 and BCH-500-1000, each with two 350 A guns. Direct DC-side coupling, optimised for electric construction machinery, delivers up to 87% discharge efficiency.
Site Power Alongside Charging
The same unit supplies AC power for welfare cabins, lighting and tools, from 125 kW on the BCH-275-200 to 500 kW on the BCH-500-1000, so a zero-emission site can run its compound without a diesel generator set for routine loads.
Taken together, these three steps give a contractor a complete, battery-centred energy system for the site: clean energy in, fast charging out and silent compound power, all managed through one EMS with 4G connectivity and remote monitoring.

MPMC BCH-275-200 mobile BESS charger on a quarry site alongside electric construction machinery.
Table 1. BCH models for zero-emission jobsites
Model
DC charging
Storage
AC output
Jobsite role
BCH-275-200
150 kW (2 x 250 A)
203.5 kWh
125 kW
Compact machinery, site vans; easy relocation by trailer
BCH-600-400
400 kW (2 x 350 A)
407 kWh
200 kW
Excavators and loaders on mid-size sites
BCH-800-600
600 kW (2 x 350 A)
610.6 kWh
200 kW, UPS-grade
High-intensity charging; 1C performance
BCH-500-1000
500 kW (2 x 350 A)
1,075 kWh
500 kW, UPS-grade
Large sites and remote compounds
Note: The table shows selected models; the BCH Series also includes the BCH-80-70 and BCH-60-70.
Built for the Realities of Construction
Construction sites are dusty, exposed and constantly changing. The BCH-275-200 uses a fully sealed liquid-cooled battery pack that keeps dust out, and the larger models use liquid-cooled packs suited to mines and construction sites, with an explosion-proof breather on the BCH-800-600 and BCH-500-1000. C4 anti-corrosion coating is standard, with C5 available on the larger models, and every unit reaches full operation within 24 hours of arrival. The battery is rated for 6,000 cycles at 90% depth of discharge and has been tested for fire, water immersion, collision and crushing.

MPMC BCH-800-600 heavy-duty mobile BESS charger, delivering up to 600 kW for electric construction machinery.
Proven Off-Grid in Norway
In Norway, a 2 MWh BCH system lets a rental construction fleet operate electric machinery at a location with no grid access. Units of 500 kW and 1,000 kWh deliver CCS2 charging at 360 kW and 400 A, enabling zero-emission machine operation throughout the project.
The project shows how rental companies can offer zero-emission charging as a service to contractors, moving BCH units from one project to the next as sites open and close.
Table 2. Zero-emission jobsite needs and BCH capabilities
Jobsite need
BCH capability
Result
Machinery charging without grid
Battery storage plus genset, methanol or solar input
Electric machines work anywhere on site
Clean compound power
AC output 125-500 kW
Cabins and tools run from stored energy
Fast set-up
Full operation within 24 hours
Charging ready on day one
Moving work fronts
Trailer, heavy-duty and container formats
Charging follows the work
Remote oversight
SCADA/EMS with 4G; OCPP 1.6
Site managers monitor every unit
Equipment dealers and rental companies can add BCH units to their electric machinery offer, with OEM customisation and private-label arrangements available. BCH-275-200 and larger models carry a 3-year system warranty and a 5-year battery performance warranty with at least 70% capacity retention.
Planning a Zero-Emission Site With MPMC
• List the electric machines and vehicles and their daily energy use
• Identify the energy source: grid, solar, methanol or genset
• Map compound loads that BCH AC output can supply
• Plan unit positions as the work front moves
• Contact MPMC at sales@mpmc-china.com or WhatsApp +86 150 0085 4420 for a zero-emission site plan
https://www.mpmc-group.com/