A diesel generator at an off-grid site is typically sized for the site’s worst-case peak load, which means it spends most of its operating life running well below that peak — burning fuel inefficiently and accumulating wear relative to the useful work actually delivered. MPMC’s HBD-R Series, its purpose-built mobile battery energy storage line, is designed to sit alongside an existing or new generator and correct this specific mismatch.
How the HBD-R “Genset Mate” Function Works
MPMC describes the HBD-R Series’ role as a “Genset Mate” rather than a standalone battery product: it performs peak shaving, transient load absorption, and selective genset shutdown during low-demand periods, letting the generator run at its optimal fuel-efficiency load point — typically around 75% — while the battery compensates for load fluctuations and motor-start inrush that would otherwise force the generator to be oversized. MPMC documents this approach as reducing fuel consumption by up to 75% compared with diesel-only operation and extending generator overhaul intervals by up to 3x.

MPMC mobile HBD-R battery energy storage unit running in parallel with a diesel generator set to absorb load swings and reduce runtime.
A Documented Before-and-After UK Result
MPMC’s UK construction site case documents a 56 kW diesel generator that had been oversized for a 3-6 kW office base load; after adding a mobile 30 kW / 61.44 kWh HBD-30-60 unit in hybrid configuration, refuelling frequency extended from every 2 days to every 7 days, and the maintenance interval extended from every 10 days to every 60 days. A related case at the same site used six HBD-30-60 units specifically to allow silent overnight and Sunday operation under a noise ordinance that prohibited generator running between 17:00 and 07:00. The HBD-30-60 is one of the smaller models in the HBD-R line, genuinely designed for transport between sites on a trailer or flatbed rather than fixed installation.

MPMC mobile battery energy storage unit from the HBD-R line — HBD-30-60, the product series featured in the UK construction-site runtime-reduction case.
A Related Result From a Stationary HBD-A Installation in Dubai — Important Clarification
MPMC’s Dubai off-grid concrete batching plant deployment is a genuinely useful data point for the same underlying principle — pairing battery storage with diesel generators to cut fuel use and runtime — but it is important to be clear about exactly what equipment was used there, since it differs from the mobile HBD-R units described above. The Dubai case combines ten stations, each pairing an HBD-500-1000 unit with three 500 kVA Perkins gensets under a three-phase EMS dispatch logic, and documents daily fuel savings of 254.13 litres per station with a CAPEX payback period of two to three years on the incremental battery investment.
The HBD-500-1000 used at Dubai belongs to MPMC’s HBD-A Series — its stationary, commercial-and-industrial-grade battery storage line, built for fixed installation rather than repeated redeployment — and is not part of the mobile HBD-R Series this article otherwise focuses on. The two series share MPMC’s underlying LFP cell technology and EMS logic, and the Dubai figures remain a legitimate, fully quantified illustration of how much a genset can benefit from battery pairing at larger, fixed industrial scale. But a reader specifically shopping for mobile, redeployable battery storage should look to the HBD-R Series and its UK-documented results above, not to the HBD-500-1000 used at Dubai, which would need to stay permanently installed at one site rather than move between locations.
Silent-Hours Operation as a Secondary Benefit of the Mobile HBD-R Line
Beyond fuel savings, an off-grid or noise-restricted site can use the same mobile HBD-R unit to run entirely on stored battery power during specific hours when generator operation is prohibited or undesirable — MPMC’s UK case deployed six HBD-30-60 units specifically to provide silent overnight and Sunday operation under a local noise ordinance, demonstrating that the same mobile hardware investment can address both fuel-runtime reduction and noise-compliance requirements simultaneously, without needing a separate stationary system for each purpose.
A Genset Partner Designed for Native Integration
The HBD-R Series is designed from the ground up as a mobile genset partner, compatible with major controller brands including DSE, ComAp, Woodward, DEIF, Smartgen, and CAT EMCP, and shares the same SCADA platform as MPMC’s own generator sets — a native design MPMC positions against competitors such as Himoinsa and Pramac, which rely on third-party Victron controllers and Pylontech battery packs to achieve equivalent genset integration.
Deployment
BESS Series Used
Configuration
Documented Result
UK Construction Site (Case 1)
HBD-R (mobile)
56 kW genset + 30 kW/61.44 kWh HBD-30-60
Refuel: 2 days to 7 days; maintenance: 10 days to 60 days
UK Construction Site (Case 2)
HBD-R (mobile)
Six HBD-30-60 units for silent-hours operation
Generator silenced 17:00-07:00 and all Sundays
Dubai Concrete Batching Plant
HBD-A (stationary — cited for reference only)
10 stations, HBD-500-1000 + 3×500 kVA gensets each
254.13 L/day fuel savings per station; 2-3 year CAPEX payback
Sizing a Mobile BESS to Reduce Genset Runtime
• Measure your generator’s actual typical load against its rated capacity to identify the oversizing gap
• Size a mobile HBD-R unit to the gap between typical load and rated capacity, not to the generator’s full rating
• Confirm controller compatibility with your existing generator brand before ordering
• Request documented fuel-saving and maintenance-extension data from a comparable prior deployment
• Ask about EMS dispatch logic tuning to match your site’s specific load profile
• Confirm remote monitoring access to track realised fuel savings after deployment
• If a supplier cites a case study as supporting evidence, confirm whether the product used was genuinely mobile or a stationary unit cited for its underlying principle only
https://www.mpmc-group.com/
MPMC Powertech Corp. -
AuthorPosts
- You must be logged in to reply to this topic.